Browse Items (714 total)

  • Tags: Retail

http://www.penninehorizons.org/Omeka_photos/HLS01105.jpg
West End, looking towards New Road with Bridge Gate on the left. The Westminster Bank later became Nat West and that was closed in 2015.

http://www.penninehorizons.org/Omeka_photos/HLS01103.jpg
Looking east, the Birchcliffe hillside is to the left of the picture.

http://www.penninehorizons.org/Omeka_photos/HLS00323.jpg
Hebden Royd Urban District. Estimates 1951-52. Unclassified County Road, towards Hebden Bridge. Reconstruction at Towngate, Heptonstall. After improvement.

http://www.penninehorizons.org/Omeka_photos/HLS00322.jpg
Hebden Royd Urban District. Estimates 1951-52. Unclassified County Road, towards Slack. Reconstruction at Towngate, Heptonstall. After improvement.

http://www.penninehorizons.org/Omeka_photos/HLS00318.jpg
Hebden Royd U.D. Leeds-Halifax-Preston Trunk Road A646, Caldene Bridge-Bridge Gate Reconstruction Scheme. Improvement at Memorial Gardens, Hebden Bridge. 1951/52 Estimates.

http://www.penninehorizons.org/Omeka_photos/HLS00316.jpg
Hebden Royd U.D. Leeds-Halifax-Preston Trunk Road A646, Caldene Bridge-Bridge Gate Reconstruction Scheme. Improvement at Memorial Gardens, Hebden Bridge. 1951/52 Estimates. The bridge across New Road connected the two parts of Crossley Mill.

http://www.penninehorizons.org/Omeka_photos/HLS00312.jpg
Hebden Royd U.D. Leeds-Halifax-Preston Trunk Road A646, Caldene Bridge-Bridge Gate Reconstruction Scheme. Outside Burnley Road School, Mytholmroyd looking east, after reconstruction.

http://www.penninehorizons.org/Omeka_photos/HLS00311.jpg
Hebden Royd U.D. Leeds-Halifax-Preston Trunk Road A646, Caldene Bridge-Bridge Gate Reconstruction Scheme. Outside Burnley Road School, Mytholmroyd looking east, before reconstruction. Photo dated 28/4/52.

http://www.penninehorizons.org/Omeka_photos/HLS00225.jpg
The part building on the left is the 'Hole-in-the-wall' pub. The other buildings were demolished in the 1960s.

http://www.penninehorizons.org/Omeka_photos/HBC01032.jpg
Due to the increase in the weight of traffic many bridges had to be strengthened around this time.

http://www.penninehorizons.org/Omeka_photos/HBC01031.jpg
A temporary footbridge was constructed for use whilst the main bridge was being repaired.

http://www.penninehorizons.org/Omeka_photos/HBC01030.jpg
A temporary footbridge was constructed for use whilst the main bridge was being repaired.

http://www.penninehorizons.org/Omeka_photos/HBC00940.jpg
The mill was demolished to facilitate the widening of the junction of Midgley road and the main road,
Output Formats

atom, csv, dcmes-xml, json, omeka-xml, rss2